RCAhdr.jpg
RCAphotos.jpg

• Redevelopment of existing 100-year-old pier into green

space and park

• New park topography required fill heights of up to 15 feet

on the existing pier

• Project designed with foamed glass aggregate build-up

and covered with soil and walking paths

• General contractor self-performed UL-FGA installation